image description
Seira Ozawa, daughter of the late BSO conductor Seiji Ozawa, speaks at the dedication on Thursday.
image description
The sign is at the corner of Massachusetts Avenue and St. Stephen's Street in Boston.

BSO, Boston Dedicate 'Seiji Ozawa Square'

Community submissionPrint Story | Email Story

Seira Ozawa and her son, Masaki, stand under the Ozawa sign dedicated to her father, Seiki Ozawa, on Thursday.
BOSTON — The city of Boston and the Boston Symphony Orchestra dedicated "Seiji Ozawa Square" on Thursday with signage on the corner of Massachusetts Avenue and St. Stephen Street.
 
Ozawa was the BSO's esteemed music director for 29 years, from 1973 to 2002. He died in February 2024 at the age of 88. 
 
Among the speakers at the unveiling were Kenny Mascary, Boston's interim director of the arts and culture; BSO President and CEO Chad Smith, and Ozawa's daughter, Seira Ozawa.
 
"Seiji left a legacy of passionate music-making, innovation, and mentorship that continues to inspire musicians and audiences worldwide," said Smith. "The Square is a symbol of how his contributions continue to resonate: the extraordinary players he hired, the audiences he inspired, and the shared memories that connect us across generations."
 
The ceremony coincides with BSO performances this week, Nov. 6-8, featuring artists and repertoire strongly associated with Ozawa. A conducting protégée of the maestro, Nodoka Okisawa makes her BSO and U.S. debuts with violin soloist Midori, a longtime Ozawa collaborator, in Dvo?ák’s Seventh Symphony and Violin Concerto — works Ozawa especially loved. The program also includes T?ru Takemitsu's "Requiem for strings," which the BSO has performed only once before, with Ozawa conducting it at Tanglewood in 1967.
 
Okisawa and Midori were among the attendees at Thursday's ceremony, which also included BSO musicians and staff, BSO Board Chair Barbara Hostetter, Consul General of Japan Seiichiro Takahashi, and Chieko Yoshida, the consul for cultural affairs at the Consulate General of Japan in Boston.
 
The maestro was well known in the Berkshires and Seiji Ozawa Hall was named for him when it was constructed in 1994 at Tanglewood, summer home of the BSO. The annual Tanglewood on Parade was dedicated to his memory in 2024 and a bust of him was installed outside the hall this past July in a private ceremony to commemorate his legacy. A timeline of his life and relationship with the BSO and Tanglewood can be found here.
 
Ozawa's last public performance was in 2022, when he conducted the Saito Kinen Orchestra to mark the 30th anniversary of his founding the festival (now the Seiji Ozawa Matsumoto Festival) in Japan. In a separate event around the same time, he conducted the SKO in Beethoven's "Egmont" overture in a performance that was broadcast live to the International Space Station and Japanese astronaut Koichi Wakata, in a collaboration with the Japan Aerospace Exploration Agency (JAXA). 
 
"Dad believed in connecting with people, through music that came from his heart," said Seira Ozawa. "He believed that we can go beyond nationalities, races, genders, or age, over any occupation, politics, or religion. He believed in the goodness of human beings."

Tags: Boston,   BSO,   dedication,   

If you would like to contribute information on this article, contact us at info@iberkshires.com.

Pittsfield Plans to Replace Bridge Over Daniels Brook

By Brittany PolitoiBerkshires Staff

PITTSFIELD, Mass.— The city plans to replace a deteriorating bridge on Hancock Road over Daniels Brook. 

Last week, the Conservation Commission continued a notice of intent application for the project to its November meeting to get more information on water flow. 

"It's a great project. We like it. We just want to make sure it's done correctly as well," Commissioner Jonathan Lothrop explained. 

Pittsfield proposes replacing the crumbling bridge with a 17-foot-wide hydraulic span underneath to an embedded precast box culvert with a span of 26 feet. The .37 work area extends about 200 feet along Hancock Road, north of 615 Hancock Road.  

Contractors from Fuss & O'Neill presented to the commission. A budget was not provided. 

"I think overall, this is going to be a really great improvement for traffic traveling over this bridge and for wildlife living under this bridge," Natural Resources Scientist Megan Woytik said. 

The 1930 bridge is showing cracking, spalling, exposed steel supports, and section loss. It was determined that repairs would retain deteriorated components and yield fewer long-term benefits, while a full replacement also improves hydraulic capacity and aquatic organism passage. 

Engineers pointed to exposed, corroding reinforcement and an existing guardrail that is no longer embedded into the structure.  Rigid barriers were placed on either side of the road so that vehicles can't impact the rail. 

View Full Story

More Pittsfield Stories