image description
A driver apparently lost control of their car and hit the porch of a house on Simonds Road on Wednesday afternoon.

No One Reported Injured After Car Strikes House in Williamstown

By Stephen DravisiBerkshires Staff
Print Story | Email Story
WILLIAMSTOWN, Mass. — No injuries were reported Wednesday after a car drove into a house at 1033 Simonds Road (Route 7).
 
Williamstown Police and Fire and Northern Berkshire EMS were at the scene at about 2 p.m. on Wednesday cleaning up and waiting for a wrecker to remove the vehicle.
 
The lone occupant of the car, the driver, had been evaluated and refused transport to the hospital, officials said.
 
Wednesday's rain may have contributed to the accident.
 
Tire tracks were visible on the property to the south leading up to the car, a light gray sedan that hit the structure directly below a "No Trespassing" sign.
 
Williamstown Police are investigating the accident and the building inspector was called to the scene to inspect the property.

Tags: motor vehicle accident,   

If you would like to contribute information on this article, contact us at info@iberkshires.com.

Williamstown's Cost Rising for Emergency Bank Restoration

By Stephen DravisiBerkshires Staff
WILLIAMSTOWN, Mass. — The cost to stabilize the bank of the Hoosic River near a town landfill continues to rise, and the town is still waiting on the commonwealth's blessing to get to work.
 
Department of Public Works Director Craig Clough was before the Finance Committee on Wednesday to share that, unlike the town hoped, the emergency stabilization work will require bringing in a contractor — and that is before a multimillion dollar project to provide a long-term solution for the site near Williams College's Cole Field.
 
"I literally got the plans last Friday, and it's not something we'll be able to do in-house," Clough told the committee. "They're talking about a cofferdam of a few hundred feet, dry-pumping everything out and then working along the river. That's something that will be beyond our manpower to do, our people power, and the equipment we have will not be able to handle it."
 
Clough explained that the cofferdam is similar to the work done on the river near the State Road (Route 2) bridge on the west side of North Adams near West Package and Variety Stores.
 
"We don't know the exact numbers yet of an estimate," Clough said. "The initial thought was $600,000 a few months ago. Now, knowing what the plans are, the costs are going to be higher. They did not think there was going to need to be a coffer dam put in [in the original estimate]."
 
The draft capital budget of $592,500 before the Fin Comm includes $500,000 toward the riverbank stabilization project.
 
The town's finance director told the committee he anticipates having about $700,000 in free cash (technically the "unreserved fund balance") to spend in fiscal year 2027 once that number is certified by the Department of Revenue in Boston.
 
View Full Story

More Williamstown Stories