HooWRA: Poetry in Motion

Print Story | Email Story
ADAMS, Mass. — Poets and poetry enthusiasts of all ages are welcome to join in Poetry in Motion, a poetic celebration of the Hoosic River Watershed.
 
Meet at the Bellows South Trailhead parking area in Greylock Glen, Adams on Saturday July 26, at 9:30am. Participants will walk the trail to Peck's Brook and find poetic inspiration along the way and at the brook. Writing prompts will be given, and there will be time given to share poems, phrases.
 
This program will last 1 hour.
 
This workshop is free and open to the public and is made possible by a grant from the Cultural Council of Northern Berkshire, a local agency which is supported by the Mass Cultural Council, a state agency. Limited to 16 participants. Click HERE to register 
 
What to bring: footwear that can get wet, insect repellent, water bottle, portable sit-upon, paper/journal & pen/pencil.
 
Arianna Alexsandra Collins, Executive Director of the Hoosic River Watershed Association, is also a naturalist educator and poet with over 30 years teaching outdoor immersion experiences and community engagement. She has been facilitating quarterly Poetry Shares at her local library in Ashfield for the past several years. You can read samples of Arianna's poetry at: https://hearkentoavalon.com/earthvoice-poetry/
If you would like to contribute information on this article, contact us at info@iberkshires.com.

Cheshire West Mountain Bridge Reconstruction Eyed for April

By Sabrina DammsiBerkshires Staff
CHESHIRE, Mass. — The town is hoping to start the reconstruction of the West Mountain Road bridge in April. 
 
The steel culvert, which carries West Mountain Road over Kitchen Brook, has several structural and erosion-related issues, including cracking, rusting, minor wall displacement, sinkholes, partially failed and dulled galvanized coating, roadway settlement, and signs of leakage. 
 
According to the state Structures Inspection Field Report from January 2025, the structure is a single-barrel corrugated steel arch with an open bottom supporting fill with an asphalt wearing surface.
 
The town was previously awarded a small municipal bridge grant to cover the engineering costs, which was done by Gill Engineering.
 
The town was again awarded another bridge grant for the reconstruction project, anticipated to cost $770,518, with the bid being awarded to CD Davenport of Greenfield. 
 
According to the plans from Gill Engineering, the project will include repairing the bridge's foundation, reinforcing the sides of the crossing, rebuilding the road surface, and adding new guardrails and drainage. 
 
During excavation, the contractors will take "extreme care" not to damage the existing corrugated steel culvert. To prevent unbalanced loading, they will remove equal amounts of fill from both sides simultaneously. 
 
View Full Story

More Adams Stories