MassDOT: South County Construction Operations

Print Story | Email Story

STOCKBRIDGE, Mass. — The Massachusetts Department of Transportation (MassDOT) is announcing various construction operations on I-90 eastbound and westbound for guardrail and bridge repair work, as well as tree trimming.

The work will take place from Monday, Dec.23, through Friday, Dec.27, during the following scheduled hours:

West Stockbridge/Stockbridge

  • Guardrail repair work will be conducted on I-90 westbound from mile marker 4.0 to 7.0, utilizing lane closures, during overnight hours on Monday, Dec.23, from 7:00 p.m. to 5:00 a.m. the following morning.
  • Guardrail repair work will be conducted on I-90 eastbound from mile marker 0.8 to 7.0, utilizing lane closures, during overnight hours on Monday, Dec.23, from 7:00 p.m. to 5:00 a.m. the following morning.

West Stockbridge

  • Bridge repair work will be conducted on I-90 eastbound from mile marker 0.8 to 3.0, utilizing lane closures, during overnight hours on Monday, Dec.23, from 7:00 p.m. to 5:00 a.m. the following morning.
  • Guardrail repair work will be conducted on I-90 westbound at mile marker 3.0, utilizing lane closures, during overnight hours on Sunday, Dec.22, and Monday, Dec.23, from 8:00 p.m. to 4:00 a.m., the following morning, with all work concluding by 4:00 a.m. on Tuesday, Dec.24,
  • Guardrail repair work will take place on I-90 westbound at mile marker 3.0 at the exit 3 off-ramp, with shoulder closure and narrowed ramp conditions, but the ramp will remain open on Monday, Dec.23, from 7:00 a.m. to 3:30 p.m. 

Stockbridge 

  • Guardrail repair work will be conducted on I-90 westbound at mile marker 4.5, utilizing lane closures, on Sunday, Dec.22, and Monday, Dec.23, from 8:00 p.m. to 4:00 a.m., the following morning, with all work concluding by 4:00 a.m. on Tuesday, Dec.24,

Otis

  • Guardrail repair work will be conducted on I-90 westbound at mile marker 19.4, utilizing lane closures, on Sunday, Dec.22, and Monday, Dec.23, from 8:00 p.m. to 4:00 a.m., the following morning, with all work concluding by 4:00 a.m. on Tuesday, Dec.24,

West Stockbridge/Stockbridge/Lee

  • Tree trimming will be conducted on I-90 eastbound from mile marker 0.0 to 10.0, utilizing shoulder closures, on Monday, Dec.23, Thursday, Dec.26, and Friday, Dec.27, from 7:00 a.m. to 3:30 p.m. each day. 

Tags: MassDOT,   

If you would like to contribute information on this article, contact us at info@iberkshires.com.

Berkshire Special Olympics Returns to Monument Mountain

iBerkshires.com Sports
GREAT BARRINGTON, Mass. – Hundreds of athletes of all ages converged at Monument Mountain Regional High School Wednesday for the 45th annual Berkshire County Special Olympics meet.
 
Runners, jumpers and throwers from throughout the county put themselves to the test and were recognized for their accomplishments.
 
As always, one of the highlights of the day was the banner parade, when Special Olympians from various teams make their way around the track to be honored by the fans in attendance.
 
This year, the newly-created Lee High School/Monument Mountain Unified Sports team had the honor of leading the athletes behind a contingent of local law enforcement officers.
 
Unified Sports, an initiative of Special Olympics and the Massachusetts Interscholastic Athletic Association, allows students with intellectual disabilities to compete in basketball in the winter and track in the summer alongside peers without disabilities while representing their schools.
 
Coaches varsity student-athletes from around South County participated in Wednesday’s event, helping to coordinate competition on two sides of the track and throughout the infield.
 
This year’s meet was dedicated to the memory of longtime Special Olympian Michele Adler, who competed for the Berkshire County-based Red Raiders team for more than 20 years and represented Massachusetts as a bowler at the 2010 USA Games.
 
View Full Story

More South Berkshire Stories