Bishop West Real Estate Announces Acquisition of All Seasons Realty Group

Print Story | Email Story
ADAMS, Mass. — Bishop West Real Estate, Inc. announced the acquisition of All Seasons Realty Group. 
 
Bishop West Real Estate, founded by broker-owners Peter West and Corey Bishop, has been active in the local real estate market for over two decades. With a combined 70 years of experience in real estate brokerage, West and Bishop are recognized for their professional expertise and personalized approach to client service.
 
All Seasons Realty Group, led by broker-owner Craig Kahn, shares a similar philosophy of client-first service and strong community involvement.
 
"We are thrilled to welcome Craig Kahn and the talented associates of All Seasons Realty Group to the Bishop West family," said Peter West. "Both of our companies have deep roots in Berkshire County and a shared vision of providing unparalleled real estate services while giving back to the community we love."
 
Corey Bishop added: "The synergy between our teams is undeniable. By combining our expertise, resources, and dedication to excellence, we are poised to offer even greater value to our clients."
 
Craig Kahn echoed these sentiments: "Joining forces with Bishop West Real Estate is an exciting opportunity for our associates and clients. Together, we can continue to raise the bar in real estate services across the region."
 
If you would like to contribute information on this article, contact us at info@iberkshires.com.

Cheshire West Mountain Bridge Reconstruction Eyed for April

By Sabrina DammsiBerkshires Staff
CHESHIRE, Mass. — The town is hoping to start the reconstruction of the West Mountain Road bridge in April. 
 
The steel culvert, which carries West Mountain Road over Kitchen Brook, has several structural and erosion-related issues, including cracking, rusting, minor wall displacement, sinkholes, partially failed and dulled galvanized coating, roadway settlement, and signs of leakage. 
 
According to the state Structures Inspection Field Report from January 2025, the structure is a single-barrel corrugated steel arch with an open bottom supporting fill with an asphalt wearing surface.
 
The town was previously awarded a small municipal bridge grant to cover the engineering costs, which was done by Gill Engineering.
 
The town was again awarded another bridge grant for the reconstruction project, anticipated to cost $770,518, with the bid being awarded to CD Davenport of Greenfield. 
 
According to the plans from Gill Engineering, the project will include repairing the bridge's foundation, reinforcing the sides of the crossing, rebuilding the road surface, and adding new guardrails and drainage. 
 
During excavation, the contractors will take "extreme care" not to damage the existing corrugated steel culvert. To prevent unbalanced loading, they will remove equal amounts of fill from both sides simultaneously. 
 
View Full Story

More Adams Stories