Adams Lions Club Golf Tourney Set for May 18

Community submissionPrint Story | Email Story
ADAMS, Mass. -- The Adams Lions Club’s annual golf tournament will be Saturday, May 18, at Forest Park Country Club.
 
Teams of four will compete in a 9-hole scramble format with tee times beginning at 8 a.m.
 
Proceeds will support Lions initiatives, including scholarships for local high school graduates and community events, such as a Halloween parade for local children and lunch for senior citizens. In addition, the club assists residents who need help with vision and hearing loss-related needs and supports research to cure eye diseases and diabetes.
 
The entry fee is $50 per player or $200 per team and includes nine holes of golf, carts, longest drive and closest-to-the-pin contests, and a chance to win $10,000 for a hole-in-one. Lunch from the Adams Lions Club food truck is included in the cost. Cash prizes will be awarded to the winning teams.
 
To register for the tournament, sign up at Forest Park, call Forest Park at 413-743-3311, or text or call Lion Nick Staffin, event chair, at 413-822-5732.
 
The Adams Lions Club has more than 60 members. Lions’ clubs are groups of men and women who identify needs within the community and work together to fulfill those needs. Lions Clubs International is the largest service club organization in the world. More than 1.4 million members in over 48,000 clubs are serving in 200 countries around the globe.
If you would like to contribute information on this article, contact us at info@iberkshires.com.

Cheshire West Mountain Bridge Reconstruction Eyed for April

By Sabrina DammsiBerkshires Staff
CHESHIRE, Mass. — The town is hoping to start the reconstruction of the West Mountain Road bridge in April. 
 
The steel culvert, which carries West Mountain Road over Kitchen Brook, has several structural and erosion-related issues, including cracking, rusting, minor wall displacement, sinkholes, partially failed and dulled galvanized coating, roadway settlement, and signs of leakage. 
 
According to the state Structures Inspection Field Report from January 2025, the structure is a single-barrel corrugated steel arch with an open bottom supporting fill with an asphalt wearing surface.
 
The town was previously awarded a small municipal bridge grant to cover the engineering costs, which was done by Gill Engineering.
 
The town was again awarded another bridge grant for the reconstruction project, anticipated to cost $770,518, with the bid being awarded to CD Davenport of Greenfield. 
 
According to the plans from Gill Engineering, the project will include repairing the bridge's foundation, reinforcing the sides of the crossing, rebuilding the road surface, and adding new guardrails and drainage. 
 
During excavation, the contractors will take "extreme care" not to damage the existing corrugated steel culvert. To prevent unbalanced loading, they will remove equal amounts of fill from both sides simultaneously. 
 
View Full Story

More Adams Stories