The new Tavitian Wing will occupy the space where a second-story bridge connects the Manton Research Center to the original museum. The plans were unveiled recently at a public forum.
The clunky air bridge will be removed and the new galleries will be the connection between the Manton and the Clark.
The bright white section is the new wing on this scale model.
WILLIAMSTOWN, Mass. — The elevated bridge between the Clark Art Institute's main museum and the Manton Research Center is being transformed into new gallery space and storage, and the permanent home of the Aso O. Tavitian collection.
The wing designed by Annabelle Selldorf will hold 12 galleries on one floor and space for storage/mechanicals. The exterior is "multicolored veined marble in tones resonant with the adjacent buildings" connecting the 1955 marble original museum to the red granite 1973 Manton building. Selldorf designed the Manton's renovation in 2016.
Construction will begin next spring with an opening slated for fall 2018.
Marrying the two buildings took some thought, Selldorf told a packed auditorium in the Manton Center last week, calling the bridge an awkward connection between two very disparate structures. It also had been the way into the museum until the expansion and new visitors center designed by architect Tadao Ando.
"We're now doing something that is a dream for every architect — that is to build a new building, albeit one where we are replacing an existing bridge, a bridge that went in in 1973 and sort of jammed into the museum building," she said, asking how many loved the bridge, then to laughter, "I don't want to see any hands. ...
"It was a long road, shall we say, but one that makes me feel we wouldn't have gotten the commission had it not been for all that which we learned here at the Clark, and for that I am immensely grateful."
Tavitian, a philanthropist, art connoisseur and software startup entrepreneur, began collecting works of mostly old masters and portraits after the turn of the century.
On his death at age 80 in 2020, he bequeathed 331 works of art to the Clark and $45 million to build to exhibit and store them. The first exhibition of about 150 works is currently on display at the Clark; the rest of the collection will be exhibited on the completion of the wing in 2028.
The gift was one of the largest in the Clark's history and the works considered among the most significant private collections of European art. It includes 132 paintings, 130 sculptures, 39 drawings, and 30 decorative arts objects.
The wing to display the collection was somewhat "designed from the inside out" and also had to have "relevance and weight."
"It negotiates two facades, one that has sort of a reddish granite, really hard, really tough, and on the other side, a white Danby marble, marble from Vermont," Selldorf pointed out. "We had fantasies about creating a mosaic that is a mix of those two materials, and very quickly realized that only yielded ugliness.
The answer was a Calacatta from Portugal that brings all the colors together. It will be cut into four different slab sizes and worked out to prevent any one color from dominating.
As for the art, Kathy Morris, who is coordinating the project, said about 60 percent of the collection will be on display at any one time.
"We will try to create an organic experience be able to loan things and move things around to keep the exhibit fresh," she said, with Selldorf adding that they don't want to reveal how it might displayed because they could change their minds -- and "we would deprive you of a fantastic surprise."
Jon Maass, the owner's representative and director of his eponymous architectural and project management firm, said the new building with its 4,600 square feet of gallery space will maintain the sustainable aspects already present on the museum campus.
"The plant that provides hot and cool chilled water to provide all the heating and cooling, it's all coming from additional capacity of that system and the geothermal wells that are already in place," he said. "It's a very very tight facade. It's a very well-insulated facade. We're using a steel superstructure instead of a concrete structure to help reduce embodied carbon. We're using LED lighting. So it's it's really about trying to create a responsible building that is using as little energy as it possibly can."
The museum is not pursuing LEED (Leadership in Energy and Environmental Design) designation but is following its guidelines.
"Considering our new wing and the new Williams College Art Museum building now in progress, there is something extraordinary happening in Williamstown," Morris said. "Our Berkshire County oasis has long harbored great collections of art, but the quality and quantity of what we are fortunate to have here rivals truly those of cities many times our size. We are so proud to be a part of this community, and we are grateful that we are surrounded by people like you who care."
If you would like to contribute information on this article, contact us at info@iberkshires.com.
Your Comments
iBerkshires.com welcomes critical, respectful dialogue. Name-calling, personal attacks, libel, slander or foul language is not allowed. All comments are reviewed before posting and will be deleted or edited as necessary.
No Comments
Firefighters Make Progress Against Wildfire on New York/Massachusetts Border
Staff Reports
WILLIAMSTOWN, Mass. — New York officials Tuesday morning reported significant progress overnight in battling a wildfire on the Massachusetts state line, with hopes of total containment as early as tonight.
"Containment right now is about 70 percent contained," N.Y. Department of Environmental Conservation Lt. Eric Stratton said during a news conference telecast by Springfield, Mass., television station WWLP. "We do anticipate by the end of the day shift today … we should be between 90 and 100 percent contained if all goes according to plan."
Stratton and Rensselaer County (N.Y.) Director of Public Safety Jay Wilson met with the media and fielded questions about the fire, which currently affects 251 acres and has spread over the state line into Williamstown.
"We had a night crew working all night long, and they were able to do a lot of good work," Stratton said. "The [relative humidities] recovered nicely, so that decreased fire behavior.
"We reinforced some [fire] line, put in a new line. We are now at 251 acres."
Stratton explained that the strategy for battling the fire involves establishing a control line around the blaze and setting fire between the control line and the wildfire to consume fuel the wildfire would need to spread.
Stratton said that as of mid-morning Tuesday, 119 fire personnel from New York and Massachusetts were involved with the effort to extinguish the blaze.
The Select Board's third-floor meeting to complete its evaluation process for the town manager will be televised by the town's public, educational and governmental television station. click for more
The park on Stetson Road “officially” opened with a ribbon cutting a little after 2 p.m., two hours after attendees started using their skateboards, bicycles, scooters and rollerblades at the Max Rothschild Memorial Skatepark. click for more
The single-vehicle accident left the operator of the motorcycle with, "serious injuries to his head, face and upper body," according to a news release from the Berkshire County District Attorney's Office. click for more
The town's two art museums were, collectively, before three town land-use boards over the last two weeks for approvals of an expansion and signage. click for more