image description
North Adams Fire and police responded to the airport during the landing.

Plane Executes Emergency Landing At North Adams Airport

Staff Reports Print Story | Email Story
NORTH ADAMS, Mass. — A private plane executed an emergency landing at Harriman-and-West Airport on Monday morning.
 
Katherine Eade, the mayor's special assistant and administrator for the airport, reported that the plane carrying two people, including the pilot, landed safely.
 
"The pilot said he essentially glided into North Adams from 12,000 feet…he was very glad to find this remote airport," Eade said.
 
The newly wedded couple was flying home to Colorado after honeymooning in Maine. The pilot, the husband, called in for an emergency landing after he noticed his engine was leaking oil. This prompted a full response from North Adams emergency services, per protocol.
 
The plane landed with no issues. There were no injuries.
 
Eade said longtime airport user Carl Villaneuva donated a courtesy car to the couple so they could drive off and find lunch and a hotel while the grounded plane was repaired at the airport.
 
According to scanner reports, emergency vehicles left the airport around 11 a.m.

 


Tags: airport,   

If you would like to contribute information on this article, contact us at info@iberkshires.com.

Pittsfield West Side School Project Feasibility Study Advancing

By Brittany PolitoiBerkshires Staff

PITTSFIELD, Mass.— Planners will soon consider exactly how a new West Side elementary school would look. 

On Tuesday, the Schools Building Needs Commission will see an overview of the Preliminary Design Program for the project involving Crosby Elementary School, Conte Community School, and possibly Stearns Elementary School. 

The PDP is the initial feasibility phase that documents space needs, existing conditions, and evaluates design options.  It will be submitted at the end of January 2027; a new school on West Street is estimated to be at least five years out. 

At the SBNC’s Sept. 1 meeting, designers TSKP Studio introduced themselves and outlined next steps for the feasibility study as Pittsfield applies for funds from the Massachusetts School Building Authority. 

"We are going to prioritize this," Superintendent Latifah Phillips said about Crosby. 

"…The building is in a really challenging condition, so we want to move responsibly quick. We don't want to move too quickly where people feel left behind. We also need to acknowledge that that building is holding on."

The design team has completed nearly 60 school projects in Massachusetts, Connecticut, and Rhode Island, including three net-zero-verified schools.  

An existing conditions assessment and site development requirements were completed, and educational visioning is to wrap up in October. The educational plan and design options will be evaluated for the remainder of 2026. 

View Full Story

More North Adams Stories