GE, EPA Detail Plans for Pittsfield Rest of River CleanupThe U.S. Environmental Protection Agency and General Electric last week held a public hearing at Herberg Middle School for the Reach 5A Final Design and Restoration Plan, which details remediation efforts for the Pittsfield stretch of the Housatonic River. GE Buildings 12 & 14 Demolished in PittsfieldGeneral Electric's former Buildings 12 and 14 are demolished and the debris will soon be capped. PCBs Detection Pauses GE DemolitionElevated levels of PCBs in a single air sample have halted demolition work on the former General Electric site. |



