Pontoosuc Ave. Bridge Project Meeting Set

Print Story | Email Story
PITTSFIELD, Mass. — The state Department of Transportation will hold a virtual information meeting on the proposed replacement of the Pontoosuc Avenue bridge.
 
The new 65-foot span over the West Branch of the Housatonic River near the intersection with Wahconah Street will include complete bridge reconstruction and Americans with Disabilities Act compliant upgrades to the pedestrian facilities. The total length of the project along the roadway is approximately 455 linear feet and will include the addition of a 5-foot shoulder bike lane, reconstruction of the sidewalk and new pavement markings and signage.
 
This project is planned to be funded through the 2026 Transportation Improvement Program for the Berkshire Metropolitan Planning Organization at an estimated cost of $7.7 million. 
 
Construction is expected to begin in fall 2026. 
 
The bridge will be closed to all modes of transportation during construction. There is no potential for a temporary vehicular or pedestrian bridge given the site characteristics and adjacent properties. Vehicle and pedestrian detours are required to provide adequate accessibility accommodation.
 
A secure right-of-way is necessary for this project. Acquisitions in fee and permanent or temporary easements may be required. The city is responsible for acquiring all needed rights in private or public lands. MassDOT's policy concerning land acquisitions will be presented at the hearing.
 
Reasonable accommodations and/or language assistance is free of charge upon request (e.g interpreters in American Sign Language and languages other than English, live captioning, videos, assistive listening devices and alternate material formats), as available. 
 
For accommodation or language assistance, the chief diversity and civil rights officer at 1-857-368-8580, TTD/TTY at 1-857-266-0603, fax 1-857-368-0602 or at MassDOT.CivilRights@dot.state.ma.us. Requests should be made as soon as possible and prior to the meeting, and for more difficult to arrange services including sign-language, CART or language translation or interpretation, requests should be made at least 10 business days before the meeting.
 
More information here

Tags: bridge project,   information session,   MassDOT,   

If you would like to contribute information on this article, contact us at info@iberkshires.com.

Pittsfield School Committee OKs $87M Budget for FY27

By Brittany PolitoiBerkshires Staff

PITTSFIELD, Mass. — The School Committee has approved an $87 million budget for fiscal year 2027 that uses the Fair Student Funding formula to assign resources. 

On Wednesday, the committee approved its first budget for the term. Morningside Community School will close at the end of the academic year and is excluded. 

"This has been quite a process, and throughout this process, we have been faced with the task of closing a $4.3 million budget deficit while making meaningful improvements in student outcomes for next year," interim Superintendent Latifah Phillips said. 

"Throughout this process, we've asked ourselves, 'What should we keep doing? What should we stop doing? And what should we start doing?' I do want to acknowledge that we are presenting a budget that has been made with difficult decisions, but it has been made carefully, responsibly, and collaboratively, again with a clear focus first on supporting our students."

The proposed $87,200,061 school budget for FY27 includes $68,886,061 in state Chapter 70 funding, $18 million from the city, and $345,000 in school choice and Richmond tuition revenues.  It is an approximately $300,000 increase from the Pittsfield Public Schools' FY26 budget of $86.9 million. 

The City Council will take a vote on May 19. 

Thirteen schools are budgeted for FY27, Morningside retired, and the middle school restructuring is set to move forward. The district believes important milestones have been met to move forward with transitioning to an upper elementary and junior high school model in September; Grades 5 and 6 attending Herberg Middle School, and Grades 7 and 8 attending Reid Middle School. 

"I also want to acknowledge that change is never easy. It is never simple, but I truly do believe that it is through these challenges that we're able to examine our systems, strengthen our practices, strengthen our relationships, and ultimately make decisions that will better our students," Phillips said. 

Included in the FY27 spending plan is $2.6 million for administration, $62.8 million for instructional costs, $7.5 million for other school services, and $7.2 million for operations and maintenance. 

Assistant Superintendent for Business and Finance Bonnie Howland reported that they met with Pittsfield High School and made two additions to its staff: an assistant principal and a family engagement attendance coordinator.

In March, the PHS community argued that a cut of $653,000 would be too much of a burden for the school to bear. The school was set to see a reduction of seven teachers (plus one teacher of deportment) and an assistant principal of teaching and learning, and a guidance counselor repurposed across the district; the administration said that after "right-sizing" the classrooms, there were initially 14 teacher reductions proposed for PHS. 

View Full Story

More Pittsfield Stories