Letter: Not NIMBY, It's Common Sense

Letter to the EditorPrint Story | Email Story

To the Editor:

Here in Williamstown those of us opposed to the former Planning Board's complex and radical zoning changes – because they were dumped on us with no time for review their impacts on our neighborhoods, no supporting documents, and while our Comprehensive Plan is still in the works – are already hearing whispers of NIMBY-ism ahead of our June 14 town meeting. So, I address the whisperers.

NIMBY, or "Not In My Backyard," is credited to Lois Gibbs of Niagara Falls, N.Y. It was her rallying cry for neighbors to oppose Hooker Chemical's dumping of toxic waste in nearby Love Canal. Gibbs declared that "people fighting for their own back yard is what democracy is about."

Of course, developers and industry interests cleverly reversed her meaning for their own financial interests, accusing Gibbs of opposing growth and – incredibly – the selfish preservation of home values. Today, accusations of racism and exclusionary zoning have been added to the list.


But here in Williamstown, those opposing the radical zoning changes are not racists, nor do we want exclusionary zoning. We simply ask our fellow residents to wait a year until our $180,000 Comprehensive Town Plan is complete before approving radical changes. Shouldn't zoning implement our Comprehensive Plan, not the other way around?

Soaring real estate prices are a national problem, but that is not to say Williamstown shouldn't try to lower housing costs while also embracing the principles of smart growth and inclusion. Most of the former Planning Board's radical changes, however, are unlikely to accomplish either. They offer no backup studies, no reports from other towns that tried something similar, no information on the impact on our schools, our property taxes, or most critically, housing affordability.

So, I encourage people to turn out on June 14 to turn down these radical zoning amendments to allow our Comprehensive Planning Team and our new Planning Board to do the hard work of developing zoning that has a chance of bringing housing costs down and increasing diversity in Williamstown. It's not NIMBY; it's just common sense.

Lee Harrison
Williamstown, Mass.

 

 


Tags: zoning,   

If you would like to contribute information on this article, contact us at info@iberkshires.com.

Williamstown's Cost Rising for Emergency Bank Restoration

By Stephen DravisiBerkshires Staff
WILLIAMSTOWN, Mass. — The cost to stabilize the bank of the Hoosic River near a town landfill continues to rise, and the town is still waiting on the commonwealth's blessing to get to work.
 
Department of Public Works Director Craig Clough was before the Finance Committee on Wednesday to share that, unlike the town hoped, the emergency stabilization work will require bringing in a contractor — and that is before a multimillion dollar project to provide a long-term solution for the site near Williams College's Cole Field.
 
"I literally got the plans last Friday, and it's not something we'll be able to do in-house," Clough told the committee. "They're talking about a cofferdam of a few hundred feet, dry-pumping everything out and then working along the river. That's something that will be beyond our manpower to do, our people power, and the equipment we have will not be able to handle it."
 
Clough explained that the cofferdam is similar to the work done on the river near the State Road (Route 2) bridge on the west side of North Adams near West Package and Variety Stores.
 
"We don't know the exact numbers yet of an estimate," Clough said. "The initial thought was $600,000 a few months ago. Now, knowing what the plans are, the costs are going to be higher. They did not think there was going to need to be a coffer dam put in [in the original estimate]."
 
The draft capital budget of $592,500 before the Fin Comm includes $500,000 toward the riverbank stabilization project.
 
The town's finance director told the committee he anticipates having about $700,000 in free cash (technically the "unreserved fund balance") to spend in fiscal year 2027 once that number is certified by the Department of Revenue in Boston.
 
View Full Story

More Williamstown Stories