image description

GE, EPA Detail Plans for Pittsfield Rest of River Cleanup

The U.S. Environmental Protection Agency and General Electric last week held a public hearing at Herberg Middle School for the Reach 5A Final Design and Restoration Plan, which details remediation efforts for the Pittsfield stretch of the Housatonic River.

image description

GE Plans for PCB Removal Gets OK

Approximately 75 percent to 80 percent of the material to be removed from the river will be transported hydraulically without the need for any trucks.

image description

Public Meeting to Review Woods Pond Remediation Plans

GE will be presenting its remedial design for Reach 6 followed by a question-and-answer period.